To arrange shoring equipment through Groundforce Shorco, you need to provide clear data about the physical space, the ground conditions, and site logistics. This ensures the technical team or software can generate a safe, Eurocode-compliant temporary works design and dispatch the correct structural components.
Four core features are scrutinised to determine what type of shoring equipment will be required:
1. Excavation Dimensions and Geometry:
• Length, Width, and Depth: The exact internal or external dimensions of the proposed excavation.
• Excavation Shape: Whether it is a straight utility trench, a square/rectangular manhole, a multi-sided cofferdam, or a complex linear shape.
• Clearance Requirements: The minimum internal clearance required inside the shoring system so that your team can safely drop in pipes, tanks, precast concrete structures, or machinery.
2. Geotechnical & Soil Data:
• Soil Profile / Borehole Logs: The precise types of soil layers present (e.g. loose sand, firm clay, made ground). If you are using advanced tools like Groundforce’s YourSolution+, you can input up to 6 distinct soil layers.
• Water Table Depth: The depth at which groundwater is encountered, as water introduces immense hydrostatic pressure on the shoring plates.
3. Surcharge Loads & Environmental Factors:
• Nearby Structures: The distance to, and weight of, any adjacent building foundations, boundary walls, or bridge abutments.
• Traffic & Plant Equipment: The proximity of busy public roads, railways, or heavy site machinery operating within the excavation's zone of influence.
• Material Storage: Any spoil heaps or stored construction materials placed near the edge of the excavation.
4. Site Logistics:
• Installation Method: Whether the customer requires a ‘dig and push’ box system, or a sheet and frame system, where sheets are driven prior to digging.
• Excavator Capacity: The weight and lifting capacity of the excavator you will have on site to ensure it can safely handle the physical weight of the equipment.