Designing Leaner Temporary Works

Designing Leaner Temporary Works - 21/01/19

Welcome back to Tony’s Technical Blog

It’s certainly been a while, a year to be exact since my last post, where has the time gone?

Anyway, to get back in the saddle so to speak, I thought I would reproduce a 5-minute “Viewpoint” article that I presented back at last October’s GE Basement Conference. As long term sponsors of this event, we are entitled to plan out one of the themed breakout sessions. The theme we settled on was "Designing Leaner Temporary Works".  To start the session we had three 5-min viewpoint presentations; contractor, consultant and supplier i.e.me, on how this could be achieved. This was how I see it from a designer/supplier’s perspective.

Tony Gould

Latest Articles

View all...
Groundforce Shorco Supports Complex Bunker Excavation for South Clyde Energy Centre

Groundforce Shorco Supports Complex Bunker Excavation for South Clyde Energy Centre - 06/02/26

The South Clyde Energy Centre in Glasgow is set to play a key role as one of Scotland’s leading...

Support for Oxford research scheme

Support for Oxford research scheme - 23/01/26

Groundforce Shorco is supplying a temporary support structure comprising its Super Mega Brace...